Matched ablation on a T03 cluster slice: 3×26Q = 78Q, same seeds and
1024 shots, small-world ring transjunctions enabled vs disabled.
Primary metric: bridge-local inter-context correlation (ICC) on ring-linked qubit pairs,
with QPC readout mitigation (qpc_noise_reducer).
Both IBM Heron backends pass |Δ bridge ICC| > 0.05 (readout mitigated, June 2026).
Coupled runs show higher bridge ICC than decoupled — consistent with transjunction imprint on ring bridge qubits.
Full-width ICC (all 26 aligned qubit indices) stays near zero (~0.003 Δ) — expected: most pairs were never bridged. This page reports bridge qubits only.
| Backend | Coupled ICC (mit) | Decoupled ICC (mit) | Δ ICC | Δ bridge ZZ | Coupled job | Decoupled job |
|---|---|---|---|---|---|---|
| ibm_fez | 0.072 | 0.008 | +0.064 | +0.117 | d8fh39ralsvc7391oe30 |
d8fh3ro7jphs739m98n0 |
| ibm_marrakesh | 0.095 | 0.026 | +0.069 | +0.156 | d8fi333alsvc7391pvag |
d8fi34jalsvc7391pve0 |
Verify jobs in the IBM Quantum console.
Machine-readable summary: results/coupling_ablation_proof_summary.json
Mean bridge ICC (readout mitigated): coupled vs decoupled
Δ = +0.069 · threshold 0.05 shown as reference line in analysis JSON